P2.5 Creative 3D Cube LED Display, For Indoor & Outdoor Commercial

Sale price$1,299.00 Regular price$1,499.00

Pixel Pitch: P2.5 (Standard Window Value)
Size: Outdoor IP65/Side-Hanging/Mini Cube-320mm
Shipping method: Standard Delivery-Ocean Freight(30-40days)
In stock
Door-to-Door Delivery
Support Credit card/Paypal
P2.5 Creative 3D Cube LED Display, For Indoor & Outdoor Commercial 详情图 1 P2.5 Creative 3D Cube LED Display, For Indoor & Outdoor Commercial 详情图 2 P2.5 Creative 3D Cube LED Display, For Indoor & Outdoor Commercial 详情图 3 P2.5 Creative 3D Cube LED Display, For Indoor & Outdoor Commercial 详情图 4 P2.5 Creative 3D Cube LED Display, For Indoor & Outdoor Commercial 详情图 5 P2.5 Creative 3D Cube LED Display, For Indoor & Outdoor Commercial 详情图 6 P2.5 Creative 3D Cube LED Display, For Indoor & Outdoor Commercial 详情图 7 P2.5 Creative 3D Cube LED Display, For Indoor & Outdoor Commercial 详情图 8 P2.5 Creative 3D Cube LED Display, For Indoor & Outdoor Commercial 详情图 9
放大查看

3D Cube LED Display– Technical Specifications

Parameter Indoor/Outdoor Resolution Screen size
Pixel Pitch 2.5
4 faces, side-hanging Outdoor IP65 128×128×4 320×320×320
5 faces, hanging Indoor 128×128×5 320×320×320
5 faces, hanging Indoor 192×192×5 500×500×500
6 faces, angled flooding Indoor 320×320×6 640×640×640

NovaStar Android-Based Control System

AC100V–AC240V, 50–60Hz

-20°C ~ 60°C, 10% ~ 85% RH

2 Years (One-on-one VIP lifelong service)

jpeg/bmp/png/webp/gif, etc

MPEG-1, MPEG-2, MPEG-4, H.265, H.264, H.263, VC-1, VP8, VP9, MVC, etc.

Mobile end: "Viplex Handy" App; Computer end: Viplex Express Cloud Platform; USB

ISO 9001, CE, RoHS, FCC

* The specifications are for reference only. Actual parameters may vary depending on the specific model or contractual agreement.

YouTube Short Video